Uncategorized

Kenya Power Blackout Schedule for 30th March 2025: Full List of Affected Areas

kenya power technician

Kenya Power has announced scheduled maintenance works that will cause power interruptions in Nairobi and North Rift regions on Sunday, 30th March 2025. This essential maintenance aims to improve service reliability, but will temporarily affect homes and businesses.

This guide provides:
✔ Exact areas affected in Nairobi & North Rift
✔ Specific timings for each blackout
✔ Alternative power solutions during outages
✔ Official Kenya Power contacts for emergencies


Nairobi Region Power Blackouts – 30th March 2025

1. Gikomba, Kamkunji & Part of Eastleigh

Time: 9:00 AM – 5:00 PM
Affected Areas:

  • Gikomba Market
  • Kariokor Flats & Kariokor DC
  • Parts of Starehe Boys Centre
  • Kombo Munyiri Road
  • Hombe Road
  • Don Bosco Eastleigh
  • Ushirika Fupi/Refu
  • Jam Street
  • Parts of Muratina Road

Business Impact:
⚠️ Gikomba traders should plan for backup power
⚠️ Starehe Boys Centre to use generators

2. Parts of Eastleigh (Water Works & Hospitals)

Time: 9:00 AM – 5:00 PM
Affected Areas:

  • Nairobi Water Eastleigh Plant
  • Section III (Partial)
  • Mother & Child Hospital
  • Madina Mall & Yare Mall
  • First Avenue (Partial)
  • California Area
  • Pumwani Hospital

Critical Notes:
✅ Hospitals advised to use backup generators
✅ Malls expected to run on standby power


North Rift Region Power Blackouts – 30th March 2025

1. Soy, Chemoset & Kabovo Areas

Time: 9:00 AM – 5:00 PM
Affected Areas:

  • Soy Town
  • Likuyani
  • Ivugwi & Sango
  • Lugulu
  • KOFC Water Intake
  • Lumino & Roberts

Agricultural Impact:
⚠️ Dairy farmers should store milk properly
⚠️ Water pumps will be offline

2. Nangili & Kongoni Zones

Time: 9:00 AM – 5:00 PM
Affected Areas:

  • Nangili Trading Centre
  • Kongoni
  • Soysambu
  • Furfural Factory
  • Chemororoch
  • Kipsomba & Tarakwa

3. Eldoret (CMC Motors & Pan Villa)

Time: 10:00 AM – 5:00 PM
Affected Areas:

  • CMC Motors
  • ODM Estate
  • Ram Garage
  • Panvilla
  • Moi University Hostels

Student Alert:
⚠️ Moi University students should charge devices in advance


Why Is Kenya Power Doing Maintenance?

Kenya Power conducts regular maintenance to:
✔ Upgrade aging infrastructure
✔ Reduce unexpected blackouts
✔ Improve electricity distribution efficiency

Did You Know?

  • Kenya loses Ksh 5B yearly due to power disruptions
  • Scheduled maintenance reduces outages by 30%

How to Prepare for the Blackout

For Homes:

🔋 Charge phones/power banks in advance
🕯️ Keep torches/candles ready
❄️ Minimize fridge openings to preserve food

For Businesses:

⚡ Arrange generators/solar power
💻 Save work frequently on computers
📱 Inform customers about temporary closures

For Farmers:

🐄 Use manual milking if dependent on electric machines
💧 Store water for livestock


Official Kenya Power Contacts

📞 Emergency Line: 97771 or 0703 070 707
📧 Email: customercare@kplc.co.ke
🐦 Twitter: @KenyaPowerCare

Report:

  • Fallen power lines
  • Prolonged outages beyond schedule
  • Emergency power needs (hospitals)

Alternative Power Solutions

OptionBest ForCost (Approx.)
Solar PowerHomes/FarmsKsh 30,000+
GeneratorsBusinessesKsh 50,000+
Power BanksMobile ChargingKsh 3,000+

While blackouts are inconvenient, planned maintenance ensures long-term reliability. Stay prepared and share this schedule with affected neighbors.

📢 Need Help?
✅ Contact Kenya Power for urgent issues
✅ Check real-time updates on Kenya Power Twitter

🔗 Share this alert with friends & family!